Silver Cloud

Silversea

Silver Cloud ship photo
  • Year of built1994
  • Length (LOA)155 m / 508 ft
  • Passengers302
  • Local Time2019-05-25 10:40
  • Course91°
  • Speed0 kn
min: 39 °F (3 °C) / max: 52 °F (12 °C) 48°F
8.7°C
Wind: 181°/ 1.9 m/s  Gust: 2.6 m/sWind: 181°/ 1.9 m/s  Gust: 2.6 m/sLight breeze
1.9 m/s
Min / Max Temperature52 °F / 12 °C
39 °F / 4 °C

One-way from Dublin to London Greenwich

23 May, 2019 - 04 Jun, 2019 (12 days)
Departure / Arrival
Port of Call
 23 May 16:00
  Dublin
 24 May 07:30 - 12:00
  Isle of Iona
 24 May 14:30 - 20:00
  Lunga Island
 25 May 06:30 - 10:00
  Oban
 25 May 15:00 - 21:00
  Mallaig
 26 May 06:30 - 16:00
  Isle of Skye
 27 May 08:00 - 16:00
  St Kilda Islands
 28 May 08:30 - 21:30
  Kirkwall
 29 May 06:30 - 12:30
  Lerwick
 29 May 14:00 - 19:00
  Isle of Noss
 30 May 10:30 - 23:00
  Aberdeen
 31 May 06:00 - 13:30
  Eyemouth
 01 Jun 05:15 - 15:45
  Hull
 02 Jun 08:00 - 20:00
  Ramsgate
 03 Jun 03:30
  London Greenwich
 04 Jun
  London Greenwich