Hapag-Lloyd Cruises to refurbish 250 suites aboard Europa 2 during Singapore dry dock

   November 17, 2026 ,   Cruise Industry

Hapag-Lloyd Cruises will refurbish ~250 suites aboard Europa 2 during a 2-week dry-dock period in Singapore, scheduled from 9th to 23rd January 2027. The project will cover 5 accommodation categories: Veranda, Ocean, Grand Ocean, Penthouse and Owner Suites, while retaining the ship’s existing architectural features and overall interior design concept.

The refurbishment, overseen by Hamburg-based interior design studio CUBIK³, will introduce updated colour schemes, furniture, textiles, carpets and lighting. The two Grand Penthouse Suites, which were redesigned during an earlier shipyard stay, will not be included.

Veranda Suites (28m2) and Penthouse Suites (42m2) will receive mint-green and coral accents, replacing the existing beige palette. Ocean and Grand Ocean Suites, measuring 28 and 42m2 respectively, will feature blue and grey tones complemented by warm brown details. The 99-square-metre Owner Suites will receive new lighting designed by Hamburg-based manufacturer GRAU, updated tables, softer furniture shapes and blue textile accents.

The project also includes ~250 custom-made sofas produced by German furniture manufacturer COR. Existing COR Shrimp armchairs will be reupholstered, while new Kagu armchairs will be introduced in the Owner Suites. Additional furniture upgrades will extend to public areas, including new Alvo chairs in the theatre. The sofas and armchairs removed during the refurbishment will be donated to a charitable organisation in Singapore.

Beyond the accommodation, the dry dock will include improvements to the ship’s Atrium and Piano Bar, alongside visual enhancements to the Sakura and Elements speciality restaurants. Further changes to the dining concept at Elements are also planned, with details to be announced later.

The refurbishment forms part of a broader investment programme covering Hapag-Lloyd Cruises' luxury fleet in 2027. Following Europa 2's Singapore shipyard stay, its sister ship Europa is scheduled for refurbishment in Bremerhaven in autumn 2027. Further details of that project are expected to be released in the coming months.